Once contractors and other relevant professionals have been appointed and designs are sufficiently advanced, work may commence on the project site. Typically, a construction site will include a secure perimeter to restrict unauthorised access, site access control points, office and welfare accommodation for personnel from the main contractor and other firms involved in the project team, and storage areas for materials, machinery and equipment. This Database was designed to perform Site Development Works Cost Estimates, based on generic cost curves for several Activity families types generated using benchmarking techniques. The benchmarked curves give Work Performance as a function of a capacity variable or combination of variables. The cost curves and other information contained in this application can be used to develop the overall construction capital cost.
QA1000 SITE DEVELOPMENT WORKS
QA1100 - CONSTRUCTION SITE CLEARING
- QA1101 - Clearing and Grubbing
- QA1102 - Topsoil Stripping, Stock Piling and Replacing
QA1200 - SITE GRADING, FILLING AND COMPACTING
- QA1201 - Site Grading, Filling and Compacting
- QA1202 - Elevated Fills for Buildings
- QA1203 - Materials Screening
- QA1204 - Dewatering And Shoring
QA1300 - STRUCTURAL EXCAVATION AND BACKFILL
- QA1301 - Structural Excavation and Backfill by Hand
- QA1302 - Structural Excavation by Machine
- QA1303 - Structural Excavation -Rock
- QA1304 - Loading Loose Materials -Cat Wheel Loaders
- QA1305 - Structural Backfill and Compaction
- QA1306 - Trench Excavation -Case 30+4 Trencher
- QA1307 - Dump Truck Hauling and Dump Charges
- QA1308 - Slope Protection and Brow Ditches Using Air Blown Mortar
QA1400 - FOUNDATION PILING
- QA1401 - Wood Piling
- QA1402 - Ray-Step Taper Piles
- QA1403 - Steel "H" Piling
- QA1404 - Precast Concrete Piling
- QA1405 - Drilled Foundations
QA1500 - CONSTRUCTION SITE DRAINAGE
- QA1501 - Polyvinyl Chloride Gravity Sewer Pipe
- QA1502 - Cast Iron Soil Pipe
- QA1503 - Concrete Drainage Pipe
- QA1504 - Corrugated Metal Pipe
- QA1505 - Vitrified Clay Pipe
- QA1506 - Concrete Drainage Structures
QA1600 - CONSTRUCTION SITE WATER SUPPLY
- QA1601 - Polyvinyl Chloride Pressure Pipe
- QA1602 - High Density Polyethylene Pressure Pipe (HDPE)
- QA1603 - Ductile Iron Pressure Pipe
- QA1604 - A.W.W.A. Waterworks Valves and Hydrants
- QA1605 - Flexible Transition Couplings
- QA1606 - Cement Mortar Lining of Pipelines in Place
QA1700 - SITE IMPROVEMENTS
- QA1701 - Asphalt Concrete Paving and Base Materials
- QA1702 - Portland Cement Concrete Paving
- QA1703 - Curbs, Curbs and Gutters, and Cross Gutters
- QA1704 - Portland Cement Concrete Walks, Steps and Pads
- QA1705 - Chain Link Fencing
- QA1706 - Landscaping
- QA1707 - Railroad Sidings
- QA1708 - Flagpoles, Pipe Bumpers and Metal Guard Railing
- QA1709 - Dike Construction
- QA1710 - Gabions and Reno Mattresses
- QA1711 - High Density Polyethylene (HDPE) Liners
- QA1712 - Demolition and Removals
- QA1713 - Asbestos Abatement