AACE Class 5–2 · Cost Intelligence Ecosystem

One ecosystem.
Three tools.
Every estimate.

Kpex is CAF Corporation\'s integrated cost intelligence ecosystem — from quick component estimates to full capital cost intelligence and a live cost data marketplace. AACE-aligned. 196 countries. Concept to close-out.

196
Countries
3
Integrated Tools
5K+
Data Points
AACE
Methodology
1G
Kpex 1G
Quick component estimator
2G
Kpex 2G
Capital cost intelligence
EX
Kpex Exchange
Cost data marketplace
196
Countries Indexed
5,000+
Cost Data Points
12
LF Driver Indices
AACE
Aligned Methodology
Why Kpex

Built for cost engineers,
by cost engineers.

The Kpex ecosystem integrates AACE methodology with real-world data across three tools — so your estimates are defensible from first concept to final control.

AACE Class 5–2 Framework
Each estimate class has its own data model, accuracy range and basis of estimate — aligned with AACE RP 56R-08.
Worldwide Location Factors
196 countries indexed across 12 driver indices: labor, procurement, political stability, trade openness and more.
Historical Benchmarks
Project cost KPIs from real EPC projects — cost curves, ratio ranges and specific cost models by industry sector.
The Kpex Ecosystem

Three tools.
One integrated workflow.

Each product is built for a distinct estimating need — and all three share the same data foundation and methodology.

1G
Kpex 1G
Quick Estimator

Instant Class 5 parametric estimates for individual equipment and components. Fast, browser-based, no login required for basic lookups.

  • Parametric cost factors
  • Equipment families A–Z
  • AACE Class 5 accuracy
Learn more
Core Platform
2G
Kpex 2G
Capital Cost Intelligence

Full AACE Class 5–2 estimation platform with cost modules for equipment, facilities, infrastructure, labor rates, LFI, benchmarks and project management.

  • Modules A–Z (full WBS)
  • 196 countries LFI
  • Labor rates & benchmarks
Explore Kpex 2G
EX
Kpex Exchange
Cost Data Marketplace

Real-time vendor pricing, RFQ workflows and cost data sharing — connecting estimators, project owners and equipment suppliers on one platform.

  • Live vendor catalog
  • RFQ & bid management
  • Data Partner programme
Join Exchange
Compare all products
Kpex 2G Modules

Full coverage.
Every estimate stage.

Kpex 2G covers the complete estimating workflow — from equipment cost models to worldwide labor rates and historical benchmarks.

A
Process Plant Components
Equipment cost models: rotating, static, heat transfer, material handling.
Cost Models
B
Historical Benchmarks
KPI curves, cost ratios and project benchmarks by industry sector.
Benchmarking
C
Facilities Cost Models
Industrial, infrastructure, buildings and renewable energy facilities.
Facilities
Z
Support Tools
LFI, labor rates, rental equipment rates, cost adjustment indices.
Tools
See all modules
How it works

From scope to estimate in four steps.

1
Define the Project
Set estimate class, scope, location and reference year.
2
Build the WBS
Structure your work breakdown using AACE-aligned cost codes.
3
Apply Cost Models
Use equipment, facilities and benchmark models to price each item.
4
Adjust & Report
Apply location factors, escalation and export the cost report.
Ready to estimate smarter?
Join cost engineers from 40+ countries using the Kpex ecosystem — from quick lookups to full capital cost intelligence.
Get Started Free See all products