Global CAPEX Project Monitor

A register of large industrial, energy and infrastructure projects worldwide with published investment values and announced capacity, organised by country. Maintained by CAF Corporation Ingeniería de Costes SL — used internally for CAPEX & capacity benchmarking.

Values are preserved in their published currency and have not yet been normalized to a common price basis or location factor.

99Total records
41Countries
49Sectors
5Countries in preview

Benchmarking note. Each record keeps the announced capacity / key driver next to its published CAPEX, so cost-per-unit-of-capacity can later be derived and normalized with the CAF Location Factor and Cost Index — the basis for global CAPEX benchmarking. Open a project to see its breakdown into areas.

▶ United Kingdom 9 projects Σ CAPEX$5.1B
ProjectSector / SubsectorCapacity / Key Driver Original CAPEXCurrent CAPEXvs CAF curveStatusConf.
Agratas Somerset Gigafactory (battery cells) Battery Manufacturing (Li-ion cells)
C.7 · New Technologies
40 GWh/yr cell output — ≈ £4.0 Bn Ref. candidate Announced / Construction A
ScopeLi-ion battery cell gigafactory — electrode, cell assembly, formation & aging, dry rooms and utilities.
Owner / PromoterAgratas / Tata Group · Private
LocationSomerset
Announced / Start—
CAPEX definitionAnnounced plant investment · GBP
Sources
Project breakdown — areas / process blocks
Electrode manufacturing

Slurry mixing, coating, drying, calendering, slitting — the largest process-equipment block.

Cell assembly

Stacking/winding, tab welding, enclosure, electrolyte filling and sealing.

Formation & aging

Initial charge/discharge, aging racks and dwell area — large footprint and power draw.

Dry rooms & HVAC

Ultra-low-dew-point dry rooms and cleanroom environmental control.

Utilities & solvent recovery

Power distribution, compressed dry air, chilled water, NMP/solvent recovery, water treatment.

Building & civil

Shell, foundations, cleanroom fit-out, warehousing and logistics.

Quality & end-of-line

Inspection, end-of-line testing, and module/pack lines where in scope.

Agratas Somerset Gigafactory Battery Manufacturing
C.1 · Industrial Process Plant
EV battery gigafactory ≈ £5.0 Bn private CAPEX ≈ £5.0 Bn Ref. candidate Development / Construction A
ScopeLarge-scale UK EV battery manufacturing facility.
Owner / PromoterAgratas / Tata Group · Private + Public
LocationSomerset
Announced / Start2025–2026
CAPEX definitionPrivate Project Investment · GBP
Sources
UK Government / CMA ↗ · 2025–2026
Scope notesLarge-scale UK EV battery manufacturing facility.
Sunderland Gigafactory Battery Manufacturing
C.7 · New Technologies
~100,000 EV/year equivalent reported £1.0 Bn £1.0 Bn Ref. candidate Development / Construction A
ScopeBattery manufacturing facility associated with UK EV supply chain.
Owner / PromoterAESC · Private + Public
LocationSunderland
Announced / StartMay-2025 · Under development
CAPEX definitionTotal Investment · GBP
Scope notesBattery manufacturing facility associated with UK EV supply chain.
Nissan EV36Zero Expansion Automotive / EV
C.1 · Industrial Process Plant
Juke / Qashqai / Leaf EV production £1.0 Bn earlier EV hub ≈ £3.0 Bn cumulative investment since 2021 Ref. candidate Execution A
ScopeLater announcement represented up to roughly £2 Bn additional investment.
Owner / PromoterNissan + supply chain partners · Private
LocationSunderland
Announced / Start2023 · Multi-year
CAPEX definitionCumulative Corporate Investment · GBP
Scope notesLater announcement represented up to roughly £2 Bn additional investment.
Siemens Healthineers MRI Facility Medical Technology Manufacturing
C.1 · Industrial Process Plant
Superconducting MRI magnet manufacturing £250 M £250 M Ref. candidate Development / Construction A
ScopeNew manufacturing facility for superconducting magnets used in MRI systems.
Owner / PromoterSiemens Healthineers · Private
LocationNorth Oxfordshire
Announced / StartMay-2024 · Development / construction
CAPEX definitionProject Investment · GBP
Scope notesNew manufacturing facility for superconducting magnets used in MRI systems.
Siemens Mobility Chippenham Rail Technology Manufacturing
C.1 · Industrial Process Plant
Rail signalling & control equipment / R&D £100 M £100 M Ref. candidate Development A
ScopeManufacturing and R&D centre.
Owner / PromoterSiemens Mobility · Private
LocationChippenham
Announced / StartMar-2024 · Development
CAPEX definitionProject Investment · GBP
Scope notesManufacturing and R&D centre.
Dogger Bank Wind Farm Renewables / Offshore Wind
C.4 · Renewable Energy
3.6 GW offshore wind (3 phases) ≈ £9 Bn ≈ £9 Bn Ref. candidate Under construction A
ScopeWorld's largest offshore wind farm.
Owner / PromoterSSE / Equinor / Vårgrønn · Private
LocationNorth Sea
Announced / Start2020–2026 · under construction
CAPEX definitionTotal Project CAPEX · GBP
Sources
SSE / Equinor · 2024
Scope notesWorld's largest offshore wind farm.
Hinkley Point C Nuclear Power
C.5 · Nuclear
3.2 GW (2× EPR) £46 Bn (revised) £46 Bn Ref. candidate Under construction A
ScopeEPR nuclear power plant.
Owner / PromoterEDF · Private + gov CfD
LocationSomerset
Announced / Start2016–2030 · under construction
CAPEX definitionTotal Project CAPEX · GBP
Sources
EDF · 2024
Scope notesEPR nuclear power plant.
HS2 High-Speed Rail (Phase 1) Infrastructure / Rail
C.2 · Infrastructure
High-speed rail, Phase 1 £45–66 Bn £45–66 Bn Ref. candidate Under construction A
ScopeHigh-speed rail line.
Owner / PromoterHS2 Ltd · Public
LocationLondon–Birmingham
Announced / Start2020–2033 · under construction
CAPEX definitionProgram Budget · GBP
Sources
UK Government · 2024
Scope notesHigh-speed rail line.
▶ USA 9 projects Σ CAPEX—
ProjectSector / SubsectorCapacity / Key Driver Original CAPEXCurrent CAPEXvs CAF curveStatusConf.
Plaquemines LNG Oil & Gas / LNG
C.1 · Industrial Process Plant
~20 MTPA LNG US$21 Bn US$21 Bn Ref. candidate Under construction A
ScopeModular LNG export facility on the Mississippi River.
Owner / PromoterVenture Global · Private
LocationPlaquemines, Louisiana
Announced / Start2023 FID · 2023–2027
CAPEX definitionTotal Project CAPEX · USD
Sources
Venture Global / FID announcement · 2023
Scope notesModular LNG export facility on the Mississippi River.
Rio Grande LNG (Phase 1) Oil & Gas / LNG
C.1 · Industrial Process Plant
17.6 MTPA (3 trains, Phase 1) US$18 Bn US$18 Bn Ref. candidate Under construction A
ScopeFirst-phase LNG export terminal.
Owner / PromoterNextDecade · Private
LocationBrownsville, Texas
Announced / Start2023 FID · 2023–2027
CAPEX definitionTotal Project CAPEX · USD
Sources
NextDecade / FID announcement · 2023
Scope notesFirst-phase LNG export terminal.
Golden Pass LNG Oil & Gas / LNG
C.1 · Industrial Process Plant
~18 MTPA LNG US$10 Bn US$10 Bn Ref. candidate Under construction A
ScopeLNG export terminal (3 trains).
Owner / PromoterExxonMobil / QatarEnergy · Private
LocationSabine Pass, Texas
Announced / Start2019 FID · 2019–2026
CAPEX definitionTotal Project CAPEX · USD
Sources
ExxonMobil / QatarEnergy · 2019
Scope notesLNG export terminal (3 trains).
Woodside Louisiana LNG (Phase 1) Oil & Gas / LNG
C.1 · Industrial Process Plant
16.5 MTPA (Phase 1) US$17.5 Bn US$17.5 Bn Ref. candidate Under construction A
ScopeFoundation development of a multi-phase LNG hub.
Owner / PromoterWoodside Energy · Private
LocationCalcasieu, Louisiana
Announced / Start2025 FID · 2025–2029
CAPEX definitionTotal Project CAPEX · USD
Sources
Woodside / FID announcement · 2025
Scope notesFoundation development of a multi-phase LNG hub.
Vogtle Units 3 & 4 Nuclear Power
C.5 · Nuclear
2.2 GW (2× AP1000) ≈ US$35 Bn ≈ US$35 Bn Ref. candidate Operating A
ScopeFirst new US reactors in decades.
Owner / PromoterGeorgia Power / Southern Company · Private
LocationGeorgia
Announced / Start2013–2024 · operational 2023–2024
CAPEX definitionTotal Project CAPEX · USD
Sources
Southern Company · 2024
Scope notesFirst new US reactors in decades.
California High-Speed Rail Infrastructure / Rail
C.2 · Infrastructure
High-speed rail, Phase 1 ≈ US$100+ Bn ≈ US$100+ Bn Ref. candidate Under construction A-
ScopeHigh-speed rail line.
Owner / PromoterCalifornia High-Speed Rail Authority · Public
LocationCalifornia
Announced / Start2015–2033 · under construction
CAPEX definitionProgram Budget · USD
Sources
CHSRA · 2024
Scope notesHigh-speed rail line.
Chobani Dairy Processing Plant (Rome, NY) Food & Beverage
C.1 · Industrial Process Plant
>1 billion lbs/y dairy (~12 M lbs milk/day, 28 lines) US$1.2 Bn US$1.2 Bn Ref. candidate Under construction A
Scope>1 billion lbs/y dairy (~12 M lbs milk/day, 28 lines)
Owner / PromoterChobani · Private
LocationRome, New York (Griffiss)
Announced / StartApr-2025 · 2025–2026
CAPEX definitionTotal Project CAPEX · USD
Sources
Merck Center of Excellence (Elkton, VA) Pharmaceuticals
C.1 · Industrial Process Plant
400,000 sq ft biologics / pharmaceutical manufacturing US$3 Bn US$3 Bn Ref. candidate Under construction A
Scope400,000 sq ft biologics / pharmaceutical manufacturing
Owner / PromoterMerck & Co. · Private
LocationElkton, Virginia
Announced / StartOct-2025 · 2025–2028
CAPEX definitionTotal Project CAPEX · USD
Sources
Merck ↗ · 2025
Wolf Summit Energy CCGT Power (Gas / CCGT)
C.1 · Industrial Process Plant
600 MW combined-cycle gas turbine US$1.2 Bn US$1.2 Bn Ref. candidate Announced A
Scope600 MW combined-cycle gas turbine
Owner / PromoterBlackstone Energy Transition Partners · Private
LocationHarrison County, West Virginia
Announced / Start2025 · 2025–2028
CAPEX definitionTotal Project CAPEX · USD
Sources
Blackstone ↗ · 2025
▶ United States 8 projects Σ CAPEX$129.3B
ProjectSector / SubsectorCapacity / Key Driver Original CAPEXCurrent CAPEXvs CAF curveStatusConf.
Meta Hyperion Data Center (Louisiana) Data Centers / AI compute
C.7 · New Technologies
5, MW IT capacity — > $50 Bn (5 GW build) Ref. candidate Announced / Construction B+
ScopeHyperscale / AI data-center campus — shell, power, cooling and IT white space.
Owner / PromoterMeta · Private
LocationRichland Parish, LA
Announced / Start—
CAPEX definitionAnnounced total campus investment (facility + IT) · USD
Project breakdown — areas / process blocks
Building shell & civil

Structure, foundations, site works and interior fit-out.

Electrical & power

Utility substation, MV/LV distribution, UPS, standby generators, switchgear.

Cooling

Chillers, CRAH/CRAC, liquid cooling for AI racks, cooling towers, pumps.

Mechanical, fire & BMS

Fire detection/suppression, building management system, physical security.

IT white space

Racks, PDUs, structured cabling; servers/GPUs may be inside or outside the announced figure.

Water & utilities

Water treatment/cooling make-up and on-site generation where applicable.

Samsung Taylor Fab (Texas) Semiconductors / 2nm fab
C.7 · New Technologies
50k wspm (2nm) — $37 Bn (site) Ref. candidate Announced / Construction B
ScopeSemiconductor wafer fab (2nm) — cleanroom, process tools, gases/chemicals/UPW and facilities.
Owner / PromoterSamsung Electronics · Private
LocationTaylor, TX
Announced / Start—
CAPEX definitionAnnounced fab/site investment · USD
Sources
Project breakdown — areas / process blocks
Cleanroom & base build

Shell, ISO-class cleanroom, raised floor, vibration isolation, sub-fab.

Process tools

Lithography (EUV/DUV), etch, deposition, CMP, implant, metrology — the dominant cost (~70% at leading edge).

Facilities (gases, chemicals, UPW)

Bulk & specialty gases, chemicals, ultrapure water, exhaust and abatement.

HVAC & environmental

Cleanroom air handling, temperature/humidity control.

Electrical & power

Substation, UPS, distribution.

Assembly, test & support

Where in scope.

TSMC Arizona Fab 21 (Phase 1) Semiconductors / 4nm fab
C.7 · New Technologies
20k wspm (4nm) — $20 Bn (Phase 1) Ref. candidate Announced / Construction B+
ScopeSemiconductor wafer fab (4nm) — cleanroom, process tools, gases/chemicals/UPW and facilities.
Owner / PromoterTSMC · Private
LocationPhoenix, AZ
Announced / Start—
CAPEX definitionAnnounced fab/site investment · USD
Sources
CNBC / TSMC ↗ · 2025
Project breakdown — areas / process blocks
Cleanroom & base build

Shell, ISO-class cleanroom, raised floor, vibration isolation, sub-fab.

Process tools

Lithography (EUV/DUV), etch, deposition, CMP, implant, metrology — the dominant cost (~70% at leading edge).

Facilities (gases, chemicals, UPW)

Bulk & specialty gases, chemicals, ultrapure water, exhaust and abatement.

HVAC & environmental

Cleanroom air handling, temperature/humidity control.

Electrical & power

Substation, UPS, distribution.

Assembly, test & support

Where in scope.

OpenAI–Oracle Stargate Abilene Data Centers / AI compute
C.7 · New Technologies
1,2 MW IT capacity — $15 Bn Ref. candidate Announced / Construction B+
ScopeHyperscale / AI data-center campus — shell, power, cooling and IT white space.
Owner / PromoterOpenAI / Oracle / SoftBank · Private
LocationAbilene, TX
Announced / Start—
CAPEX definitionAnnounced total campus investment (facility + IT) · USD
Project breakdown — areas / process blocks
Building shell & civil

Structure, foundations, site works and interior fit-out.

Electrical & power

Utility substation, MV/LV distribution, UPS, standby generators, switchgear.

Cooling

Chillers, CRAH/CRAC, liquid cooling for AI racks, cooling towers, pumps.

Mechanical, fire & BMS

Fire detection/suppression, building management system, physical security.

IT white space

Racks, PDUs, structured cabling; servers/GPUs may be inside or outside the announced figure.

Water & utilities

Water treatment/cooling make-up and on-site generation where applicable.

Microsoft Fairwater Data Center (Wisconsin) Data Centers / AI compute
C.7 · New Technologies
45 MW IT capacity — $3.3 Bn (initial build) Ref. candidate Announced / Construction A-
ScopeHyperscale / AI data-center campus — shell, power, cooling and IT white space.
Owner / PromoterMicrosoft · Private
LocationMount Pleasant, WI
Announced / Start—
CAPEX definitionAnnounced total campus investment (facility + IT) · USD
Sources
Project breakdown — areas / process blocks
Building shell & civil

Structure, foundations, site works and interior fit-out.

Electrical & power

Utility substation, MV/LV distribution, UPS, standby generators, switchgear.

Cooling

Chillers, CRAH/CRAC, liquid cooling for AI racks, cooling towers, pumps.

Mechanical, fire & BMS

Fire detection/suppression, building management system, physical security.

IT white space

Racks, PDUs, structured cabling; servers/GPUs may be inside or outside the announced figure.

Water & utilities

Water treatment/cooling make-up and on-site generation where applicable.

Commonwealth Fusion SPARC Fusion energy (HTS magnets)
C.7 · New Technologies
140 MW fusion (target) — ≈ $3 Bn invested Ref. candidate R&D / First-of-a-kind B
ScopeMagnetic-confinement fusion device — HTS magnet system, cryoplant, vacuum vessel, heating and controls.
Owner / PromoterCommonwealth Fusion Systems · Private
LocationDevens, MA
Announced / Start—
CAPEX definitionCapital raised — compact HTS demonstration device · USD
Sources
Project breakdown — areas / process blocks
HTS magnet system

REBCO/YBCO tape, toroidal & poloidal field coils, structure, cryostat — the enabling technology.

Cryogenic plant

Helium refrigeration and cooling distribution for the superconducting magnets.

Vacuum vessel & first wall

Vessel, blanket, divertor and plasma-facing components.

Power supplies & control

Magnet power supplies, plasma control and protection systems.

Heating & current drive

RF and/or neutral-beam heating systems.

Building & civil

Tokamak hall, radiation shielding, foundations.

Wolfspeed Mohawk Valley SiC Fab Semiconductors / SiC power fab
C.7 · New Technologies
Announced (capacity not disclosed per fab) — ≈ $1.0 Bn (initial) Ref. candidate Announced / Construction C
ScopeSilicon-carbide (SiC) power-device fab — 200 mm lines, epitaxy, high-temp processing.
Owner / PromoterWolfspeed · Private
LocationMarcy, NY
Announced / Start—
CAPEX definitionAnnounced fab investment · USD
Sources
Wolfspeed ↗ · 2022
Project breakdown — areas / process blocks
Cleanroom & base build

Shell, cleanroom, sub-fab — for 200 mm SiC lines.

SiC process tools

Epitaxy, high-temperature implant/anneal, etch, metallization, wafer thinning — the dominant cost.

Facilities (gases, chemicals, UPW)

Specialty gases, chemicals, ultrapure water, abatement.

Electrical & power

Substation, UPS, distribution.

Substrate handling & test

SiC boule/wafer handling, metrology, end-of-line test.

Commonwealth Fusion ARC (commercial) Fusion energy (HTS magnets)
C.7 · New Technologies
Commercial plant (undisclosed) — Not disclosed ("multi-billion") Ref. candidate R&D / First-of-a-kind C
ScopeMagnetic-confinement fusion device — HTS magnet system, cryoplant, vacuum vessel, heating and controls.
Owner / PromoterCommonwealth Fusion Systems · Private
LocationChesterfield County, VA
Announced / Start—
CAPEX definitionFirst commercial plant — CAPEX undisclosed (≈400 MWe, Google 200 MW offtake) · USD
Sources
Project breakdown — areas / process blocks
HTS magnet system

REBCO/YBCO tape, toroidal & poloidal field coils, structure, cryostat — the enabling technology.

Cryogenic plant

Helium refrigeration and cooling distribution for the superconducting magnets.

Vacuum vessel & first wall

Vessel, blanket, divertor and plasma-facing components.

Power supplies & control

Magnet power supplies, plasma control and protection systems.

Heating & current drive

RF and/or neutral-beam heating systems.

Building & civil

Tokamak hall, radiation shielding, foundations.

▶ United Arab Emirates 7 projects Σ CAPEX—
ProjectSector / SubsectorCapacity / Key Driver Original CAPEXCurrent CAPEXvs CAF curveStatusConf.
Masdar 24/7 Renewable Energy Project Renewables + BESS
C.4 · Renewable Energy
Gigascale 24/7 renewable power US$6.1 Bn US$6.1 Bn Ref. candidate Financial Close A
ScopeUtility-scale renewable generation and storage program intended to provide round-the-clock power.
Owner / PromoterMasdar / EWEC · Utility / Government-linked
LocationAbu Dhabi
Announced / StartJul–Aug-2026 · Financial close / construction phase
CAPEX definitionTotal Capital Investment · USD
Scope notesUtility-scale renewable generation and storage program intended to provide round-the-clock power.
du–Microsoft Hyperscale Data Center Data Centers / AI
C.7 · New Technologies
Hyperscale data center AED 2.0 Bn AED 2.0 Bn Ref. candidate Announced / Development A
ScopeDedicated hyperscale digital infrastructure.
Owner / Promoterdu / Microsoft · Private / Government-linked
LocationDubai
Announced / StartApr-2025 · Development
CAPEX definitionProject Investment · AED
Sources
Dubai Media Office ↗ · 22-Apr-2025
Scope notesDedicated hyperscale digital infrastructure.
Asprofin UAE Hyperscale Program Data Centers
C.7 · New Technologies
750 MW–1.28 GW US$5 Bn lower case US$5–12 Bn estimate Ref. candidate Proposal / Early Development B
ScopeThree-campus concept; internal CAPEX model reported around US$4–8 M/MW.
Owner / PromoterAsprofin · Private
LocationUAE
Announced / StartJun-2026 · Early development
CAPEX definitionProspective Capital Requirement · USD
Sources
Industry / project announcement sources · Jun-2026
Scope notesThree-campus concept; internal CAPEX model reported around US$4–8 M/MW.
ADNOC Ruwais LNG Oil & Gas / LNG
C.1 · Industrial Process Plant
9.6 MTPA (2 trains) ≈ US$5.5 Bn ≈ US$5.5 Bn Ref. candidate Under construction A
ScopeLow-carbon LNG facility powered by clean grid power.
Owner / PromoterADNOC · Public
LocationAl Ruwais
Announced / Start2024 FID · 2024–2028
CAPEX definitionTotal Project CAPEX · USD
Sources
ADNOC / FID announcement · 2024
Scope notesLow-carbon LNG facility powered by clean grid power.
Borouge 4 Petrochemicals
C.1 · Industrial Process Plant
+1.4 Mtpa polyolefins (to 6.4 Mtpa total) ≈ US$6.2 Bn ≈ US$6.2 Bn Ref. candidate Under construction A
ScopeFourth expansion of the Borouge polyolefins complex.
Owner / PromoterADNOC / Borealis · Public
LocationRuwais
Announced / Start2023 FID · 2023–2025
CAPEX definitionTotal Project CAPEX · USD
Sources
ADNOC / Borouge · 2023
Scope notesFourth expansion of the Borouge polyolefins complex.
Al Dhafra Solar PV Renewables / Solar PV
C.4 · Renewable Energy
2 GW (2,100 MW) solar PV ≈ US$1.1 Bn ≈ US$1.1 Bn Ref. candidate Operating A
ScopeOne of the largest single-site solar plants.
Owner / PromoterEWEC / TAQA / Masdar / EDF / JinkoPower · Utility
LocationAbu Dhabi
Announced / Start2020–2023 · operational 2023
CAPEX definitionTotal Project CAPEX · USD
Sources
EWEC · 2023
Scope notesOne of the largest single-site solar plants.
Taweelah RO Desalination Water & Desalination
C.1 · Industrial Process Plant
909,000 m³/day (200 MIGD) RO ≈ US$1 Bn ≈ US$1 Bn Ref. candidate Operating A
ScopeWorld's largest reverse-osmosis desalination plant.
Owner / PromoterEWEC / ACWA Power · Utility
LocationAbu Dhabi
Announced / Start2019–2022 · operational 2022
CAPEX definitionTotal Project CAPEX · USD
Sources
EWEC · 2022
Scope notesWorld's largest reverse-osmosis desalination plant.
▶ Saudi Arabia 7 projects Σ CAPEX—
ProjectSector / SubsectorCapacity / Key Driver Original CAPEXCurrent CAPEXvs CAF curveStatusConf.
Jafurah Unconventional Gas Oil & Gas / Unconventional gas
C.1 · Industrial Process Plant
Phase 1 ~2 Bcf/d sales gas (to 2 Bcf/d+ ) ≈ US$100 Bn program ≈ US$100 Bn program Ref. candidate Under construction A
ScopeLargest shale-gas development outside North America; phased.
Owner / PromoterSaudi Aramco · Public
LocationEastern Province
Announced / Start2020 onward · phased to 2030
CAPEX definitionTotal Program Investment · USD
Sources
Saudi Aramco · 2020
Scope notesLargest shale-gas development outside North America; phased.
Amiral Petrochemical Complex Petrochemicals
C.1 · Industrial Process Plant
Mixed-feed cracker ~1.65 Mtpa ethylene US$11 Bn US$11 Bn Ref. candidate Under construction A
ScopeIntegrated crackers and downstream units expanding SATORP.
Owner / PromoterAramco / SABIC · Public
LocationJubail
Announced / Start2023 FID · 2023–2027
CAPEX definitionTotal Project CAPEX · USD
Sources
Aramco / SABIC · 2023
Scope notesIntegrated crackers and downstream units expanding SATORP.
NEOM Green Hydrogen (Helios) Renewables / Green Hydrogen
C.4 · Renewable Energy
600 t/day green H2 → 1.2 Mtpa green ammonia US$8.4 Bn US$8.4 Bn Ref. candidate Under construction A
ScopeWorld-scale green hydrogen-to-ammonia plant.
Owner / PromoterNEOM Green Hydrogen Co (ACWA / Air Products / NEOM) · PPP
LocationOxagon, NEOM
Announced / Start2023 FID · 2023–2026
CAPEX definitionTotal Project CAPEX · USD
Sources
NEOM / ACWA Power · 2023
Scope notesWorld-scale green hydrogen-to-ammonia plant.
Qurayyah CCGT IPP (Hajar Two) Power (Gas / CCGT)
C.1 · Industrial Process Plant
3,010 MW CCGT SAR 10.8 Bn (US$2.9 Bn) SAR 10.8 Bn (US$2.9 Bn) Ref. candidate Under construction A
Scope3,010 MW CCGT
Owner / PromoterACWA Power (Hajar Two Electricity Company) · Private + Public
LocationQurayyah, Eastern Province
Announced / Start2024 · 2024–2027
CAPEX definitionTotal Project CAPEX · SAR / USD
Sources
Taiba-2 & Qassim-2 CCGT IPPs Power (Gas / CCGT)
C.1 · Industrial Process Plant
3.96 GW combined CCGT SAR 14.6 Bn (US$3.9 Bn) SAR 14.6 Bn (US$3.9 Bn) Ref. candidate Under construction A
Scope3.96 GW combined CCGT
Owner / PromoterACWA Power (AEC) / Ajlan & Bros / EDF Group · Private + Public
LocationTaiba and Qassim regions
Announced / Start2024 · 2024–2027
CAPEX definitionTotal Project CAPEX · SAR / USD
Sources
Enerdata ↗ · 2024
ACWA Power–Badeel–Aramco 15 GW Renewables Portfolio Renewables / Solar PV
C.4 · Renewable Energy
15 GW (5 solar PV + 2 wind) US$8.2 Bn US$8.2 Bn Ref. candidate FID / Sanctioned A
Scope15 GW (5 solar PV + 2 wind)
Owner / PromoterACWA Power / Badeel / SAPCO (Aramco) · Private + Public
LocationAfif, Humaij, Bisha, Khulis (+ wind)
Announced / StartNov-2025 · 2025–2028
CAPEX definitionTotal Project CAPEX · USD
Al Shuaibah Solar PV (PV1 & PV2) Renewables / Solar PV
C.4 · Renewable Energy
2,631 MW solar PV SAR 8.25 Bn (US$2.2 Bn) SAR 8.25 Bn (US$2.2 Bn) Ref. candidate Under construction A
Scope2,631 MW solar PV
Owner / PromoterACWA Power / Badeel · Private + Public
LocationAl Shuaibah, Makkah Province
Announced / Start2023–2024 · 2024–2026
CAPEX definitionTotal Project CAPEX · SAR / USD
Sources
🔒

The full Global CAPEX Monitor is a member feature

You're seeing the top 5 countries. Unlock 36 more countries and 59 more projects — with capacity, CAPEX, sources and the area-by-area breakdown of every project.

Data-quality note. “Published investment”, “approved budget”, “current forecast”, “financing secured” and “final outturn cost” are not equivalent — the CAPEX definition and record type behind each figure differ, and confidence grades (A / A- / B / B+) reflect source strength. Figures are indicative, in their published currency, and should be verified against the cited source before use.