Kpex 2G  /  Module C
Module C

Facilities Cost Models

Parametric cost models for complete facilities — industrial plants, infrastructure, buildings, renewable energy, nuclear and mining — sized by capacity, from early feasibility through Class 3 estimates.

Watch the sub-module videos Free with your work e-mail
Sub-modules

What is inside

▶ Video
C.1
Industrial Process Plants
Oil & gas production onshore and offshore, LNG, refineries, power, water, chemicals, food, pharmaceuticals, paper, metals, textiles, steam and chilled water, manufacturing, solid waste and plant retrofits.
91 facility models
Explore →
▶ Video
C.2
Infrastructure Projects
Nine infrastructure types: highways, railways, tunnels, airport runways, high-voltage lines, substations, pipelines, aqueducts and dams, each one estimated from capital cost to operation and decommissioning.
9 infrastructure types
Explore →
▶ Video
C.3
Building Projects
Twenty building types, from offices, schools and hospitals to hotels, warehouses, airport terminals and control buildings, each one estimated element by element and carried through its operation and demolition.
20 building types
Explore →
▶ Video
C.4
Renewable Energy Facilities
Twelve technologies: solar PV, onshore and offshore wind, battery storage, CSP, green hydrogen, hydropower, geothermal, bioenergy, power-to-X, hybrid systems and large heat pumps, each one estimated from capital cost to operation and decommissioning.
12 renewable technologies
Explore →
▶ Video
C.5
Nuclear Projects
Six nuclear designs: large PWR, BWR, small modular reactors, CANDU / PHWR, HTGR and Generation IV, and life extension of existing units — each one estimated from capital cost to operation and decommissioning.
6 nuclear designs
Explore →
▶ Video
C.6
Mining Projects
Six mine types: open-pit copper, underground gold, open-pit coal, iron ore, copper heap leach and lithium — each one estimated from capital cost to operation and mine closure.
6 mine types
Explore →
How it works

What you get

Capacity is the driver
Every facility is sized by the capacity that drives its cost: barrels per day, megawatts, square metres, tonnes per day.
Site and project conditions
Terrain, access, seismicity, delivery model and other conditions adjust the cost where they really matter.
A cost breakdown for each facility
The total is split into its cost accounts, ready to become the WBS of an estimate.
Brought to today and to the site
Costs are escalated with the Kpex Cost Index and can be moved to any of 197 countries with the Location Factor.
Ready to estimate your next project?
Join cost engineers using Kpex for AACE-aligned estimates worldwide.