Back to Kpex 2G
Kpex 2G  /  Module D
Module D

Operating Cost (OPEX)

Operating cost of process plants: manufacturing cost per unit of product, split into raw materials, utilities, labour and depreciation, and scaled to the plant capacity.

Watch the sub-module videos Free with your work e-mail
Sub-modules

What is inside

▶ Video
D.1
OPEX Cost Estimator
The operating cost of 80 plant types in nine sectors — chemicals, food, power, water, refining, metals, mining, pulp and paper, and renewables — per unit of product and per year, for the capacity you enter.
80 plant types
Explore →
D.2
Bottom-Up OPEX Estimator
Operating cost built from the bottom up: raw materials and utilities by consumption × current price, the operating crew from the plant’s equipment and local wages, maintenance and insurance on the Module C CAPEX.
Coming soon
How it works

What you get

Cost per unit of product
Manufacturing cost per unit of product for each chemical, from a documented reference plant.
Where the money goes
The split between raw materials, utilities, labour and depreciation for every product.
Scaled to your plant
The reference cost is scaled to the capacity of your plant with its own exponent.
Part of the life-cycle cost
OPEX sits next to CAPEX and ABEX in the estimate, for a full life-cycle view.
Ready to estimate your next project?
Join cost engineers using Kpex for AACE-aligned estimates worldwide.
Get Started