Decommissioning is one of the most cost-uncertain phases in any asset lifecycle. CAF Corporation delivers structured, data-backed cost estimates for offshore and onshore asset retirement — from early screening through detailed well abandonment and site remediation budgets.

Coverage

Full Lifecycle Decommissioning Cost Intelligence

From offshore platform removal to onshore facility decontamination, our cost models cover the complete scope of asset retirement across all major industry sectors.

01 — Offshore Platforms
Fixed & Floating Structure Removal
Cost models for jacket removal, topside dismantlement, subsea infrastructure decommissioning and well abandonment for offshore fixed and floating facilities.
02 — Onshore Facilities
Process Plant Decommissioning
Shutdown, demolition and waste management cost estimation for refineries, chemical plants, power stations and industrial process facilities.
03 — Pipelines
Pipeline Abandonment & Removal
In-place abandonment, full removal and subsea pipeline decommissioning cost models covering all pipe sizes, materials and geographic zones.
04 — Well Abandonment
P&A Cost Estimation
Plug and abandonment cost build-up by well type, depth profile and regulatory framework — calibrated to regional rig rates and services markets.
05 — Environmental
Remediation & Site Restoration
Environmental cleanup, soil decontamination and site restoration cost estimation aligned with regulatory requirements and environmental risk profiles.
06 — Waste Management
Material Classification & Disposal
Waste stream identification, classification, treatment and disposal cost estimation — including steel recycling credits, hazardous waste handling and offshore logistics.
E.1
Kpex Decommissioning Module
6+
Asset Types Covered
AACE
Class 5 to Class 2 Estimates
Global
Regulatory Frameworks
Our Approach

Structured Cost Estimation for a Complex Scope

Decommissioning cost estimation requires specialized data, methodologies and regulatory expertise. Our approach integrates all three.

Executed Project Benchmarks
CAF Kpex module E.1 contains historical decommissioning cost data from executed offshore and onshore projects — used to validate and calibrate every estimate we produce.
Regulatory Alignment
All cost estimates are structured around applicable regulatory frameworks — OSPAR, BSEE, UK HSE, Norwegian PSA and other jurisdiction-specific requirements.
Risk & Contingency Quantification
We apply structured risk analysis and scenario planning to develop P10/P50/P90 cost ranges for decommissioning budgets.
Market-Calibrated Rates
Vessel day rates, rig costs, specialist contractor fees and waste disposal costs are benchmarked to current and forecast market conditions by geography.
Schedule-Integrated Costing
Decommissioning costs are highly schedule-sensitive. Our estimates are tightly integrated with project schedule and campaign sequencing to reflect real cost drivers.
Audit-Ready Documentation
All estimates include a fully documented basis, assumptions, exclusions and data sources — structured for regulatory submission, financial provisioning and audit review.
Planning an Asset Retirement?
Talk to our decommissioning cost specialists about your facility type, regulatory jurisdiction and timeline.